Cisco 3850 Reload Slot Command
2021年2月27日Register here: http://gg.gg/ogq7f
We are currently suffering from a couple bugs (one internal which causes the switch to reboot and one cosmetic bug that just fills up our syslog server). Consequently, we are upgrading a total of 92 Cisco 3850 switches over the course of 2 nights.
I decided to set up constant pings to our devices and use the ’reload at’ command to reload all of the switch stacks on all 6 floors of one building at the same time.
*If you do, the command is rejected. Use the reload slot current stack member number privileged EXEC command to reload the stack member and to apply this configuration change. This example shows how to change the member number of stack member 6 to 7.
*Cisco Catalyst 3850 Switches with 12 and 24 1 Gigabit Ethernet SFP Ports Figure 4. Cisco Catalyst 3850 Switches with 10 Gigabit Ethernet 48 ports KEY FEATURES AND BENEFITS Features Cisco Digital Network Architecture. Only Cisco delivers a digital-ready approach that starts at the edge and extends to where applications reside.
We are currently on code version 03.03.05 and are upgrading to 03.07.00 at the advice of Cisco TAC.
I couldn’t find much good documentation on the ’reload at’ command so I used my test switch stack to figure it out (using the question mark on the CLI is kind of ambiguous).
The Cisco Catalyst 3850 is hardware capable for 802.1ae on all ports on the switch. Software support will be available later. What management ports are available on the Cisco Catalyst 3850? The Cisco Catalyst 3850 comes with a 10/100 Ethernet dedicated management port on the backside of the switch right above the console port. Command Reference, Cisco IOS XE Gibraltar 16.12.x (Catalyst 3850 Switches) 31/Jul/2019 Command Reference, Cisco IOS XE Fuji 16.9.x (Catalyst 3850 Switches) 28/Sep/2018 Command Reference, Cisco IOS XE Fuji 16.8.x (Catalyst 3850 Switches) 03/Apr/2018 Command Reference, Cisco IOS XE Everest 16.6.x (Catalyst 3850 Switches) 03/Dec/2017 Command Reference, Cisco IOS XE Everest 16.5.1a (Catalyst 3850. Stardew valley free download.
Below shows what I typed into the CLI:
/noverify Don’t verify file signature before reload. LINE Reason for reload cancel Cancel pending reload slot Slot number card <cr>Switch#reloadat ?
<1-31> Day of the month MONTH Month of the year
LINE <cr>Switch#reloadat 21:05 PDT JunLINE <cr>Switch#reloadat 21:05 ? LINE Reason for reload <cr>Switch#reloadat 21:05 ? LINE Reason for reload <cr>Switch#reloadat 21:05 Upgrade ?
That is what I mean by ambiguous.. It keeps giving me that ’LINE’ command.After some trial and error, I figured out the following command works:Switch#reload at 21:05 6/09/15 UpgradeReloadscheduled for 21:05:00 PDT Tue Jun 9 2015 (in 6 hours and 36 minutes) byconsoleReload reason:6/09/15 UpgradeReload command is being issued on Active unit, this willreload the whole stackSwitch#Jun 921:28:27.309: %SYS-5-SCHEDULED_RELOAD: Reload requested for 21:05:00 PDT TueJun 9 2015 at 14:28:18 PDT Tue Jun 9 2015 by console. Reload Reason: 6/09/15 Upgrade.Jun 921:28:27.309: %SYS-5-SCHEDULED_RELOAD: Reload requested forCisco IOSSoftware, IOS-XE Software, Catalyst L3 Switch Software(CAT3K_CAA-UNIVERSALK9-M), Version 03.03.02SE RELEASE SOFTWARE (fc2)TechnicalSupport: http://www.cisco.com/techsupportCompiled Thu20-Feb-14 21:17 by prod_rel_team
Switch PortsModel SW Version SWImage Mode* 1 32 WS-C3850-24P 03.03.02SE cat3k_caa-universalk9INSTALL 2 32 WS-C3850-24P 03.03.02SE cat3k_caa-universalk9INSTALL
---------Switchuptime : 1 week, 5 days, 3 hours, 39 minutesMotherboardAssembly Number :Model RevisionNumber : K0ModelNumber : WS-C3850-24PSoftware Install Command Cisco 3850
Reloadscheduled for 21:05:00 PDT Tue Jun 9 2015 (in 6 hours and 36 minutes) byconsole
Cisco 3850 Commands Cheat Sheet
As you can see, this shows I am using code version 03.03.02. This is my non-production stack.
You can also issue the following command to reload on a specific day:
Switch#reload at 20:00 07 Dec Upgrade
or a specific time:
Switch#reload in 120 (reloads the switch in 2 hours)
Update - 6/10/2015
Reload/Upgrade successful!
Here is what the switch does when you are logged in to it.
Reload scheduled for 21:05:00 PDT Tue Jun 9 2015 (in 1 minute and 20 seconds) by xxxxxxxxx on vty0 (x.x.x.x)
Reload reason: 6/09/15 Upgrade
Swtich#sh clo
21:03:56.858 PDT Tue Jun 9 2015
Switch#
***
*** --- SHUTDOWN in 0:01:00 ---
***
Switch#
***
*** --- SHUTDOWN NOW ---
***
Update - 4/29/2016Cisco 3850 Stack Commands
Cisco 3850 Reload Slot Command Block
Cisco 3850 Switch CommandsWe are no longer on IOS 03.07.00 and have actually downgraded to 03.06.04 which is the recommended release. We were having some ’bug’gy behavior.
Register here: http://gg.gg/ogq7f
https://diarynote.indered.space
We are currently suffering from a couple bugs (one internal which causes the switch to reboot and one cosmetic bug that just fills up our syslog server). Consequently, we are upgrading a total of 92 Cisco 3850 switches over the course of 2 nights.
I decided to set up constant pings to our devices and use the ’reload at’ command to reload all of the switch stacks on all 6 floors of one building at the same time.
*If you do, the command is rejected. Use the reload slot current stack member number privileged EXEC command to reload the stack member and to apply this configuration change. This example shows how to change the member number of stack member 6 to 7.
*Cisco Catalyst 3850 Switches with 12 and 24 1 Gigabit Ethernet SFP Ports Figure 4. Cisco Catalyst 3850 Switches with 10 Gigabit Ethernet 48 ports KEY FEATURES AND BENEFITS Features Cisco Digital Network Architecture. Only Cisco delivers a digital-ready approach that starts at the edge and extends to where applications reside.
We are currently on code version 03.03.05 and are upgrading to 03.07.00 at the advice of Cisco TAC.
I couldn’t find much good documentation on the ’reload at’ command so I used my test switch stack to figure it out (using the question mark on the CLI is kind of ambiguous).
The Cisco Catalyst 3850 is hardware capable for 802.1ae on all ports on the switch. Software support will be available later. What management ports are available on the Cisco Catalyst 3850? The Cisco Catalyst 3850 comes with a 10/100 Ethernet dedicated management port on the backside of the switch right above the console port. Command Reference, Cisco IOS XE Gibraltar 16.12.x (Catalyst 3850 Switches) 31/Jul/2019 Command Reference, Cisco IOS XE Fuji 16.9.x (Catalyst 3850 Switches) 28/Sep/2018 Command Reference, Cisco IOS XE Fuji 16.8.x (Catalyst 3850 Switches) 03/Apr/2018 Command Reference, Cisco IOS XE Everest 16.6.x (Catalyst 3850 Switches) 03/Dec/2017 Command Reference, Cisco IOS XE Everest 16.5.1a (Catalyst 3850. Stardew valley free download.
Below shows what I typed into the CLI:
/noverify Don’t verify file signature before reload. LINE Reason for reload cancel Cancel pending reload slot Slot number card <cr>Switch#reloadat ?
<1-31> Day of the month MONTH Month of the year
LINE <cr>Switch#reloadat 21:05 PDT JunLINE <cr>Switch#reloadat 21:05 ? LINE Reason for reload <cr>Switch#reloadat 21:05 ? LINE Reason for reload <cr>Switch#reloadat 21:05 Upgrade ?
That is what I mean by ambiguous.. It keeps giving me that ’LINE’ command.After some trial and error, I figured out the following command works:Switch#reload at 21:05 6/09/15 UpgradeReloadscheduled for 21:05:00 PDT Tue Jun 9 2015 (in 6 hours and 36 minutes) byconsoleReload reason:6/09/15 UpgradeReload command is being issued on Active unit, this willreload the whole stackSwitch#Jun 921:28:27.309: %SYS-5-SCHEDULED_RELOAD: Reload requested for 21:05:00 PDT TueJun 9 2015 at 14:28:18 PDT Tue Jun 9 2015 by console. Reload Reason: 6/09/15 Upgrade.Jun 921:28:27.309: %SYS-5-SCHEDULED_RELOAD: Reload requested forCisco IOSSoftware, IOS-XE Software, Catalyst L3 Switch Software(CAT3K_CAA-UNIVERSALK9-M), Version 03.03.02SE RELEASE SOFTWARE (fc2)TechnicalSupport: http://www.cisco.com/techsupportCompiled Thu20-Feb-14 21:17 by prod_rel_team
Switch PortsModel SW Version SWImage Mode* 1 32 WS-C3850-24P 03.03.02SE cat3k_caa-universalk9INSTALL 2 32 WS-C3850-24P 03.03.02SE cat3k_caa-universalk9INSTALL
---------Switchuptime : 1 week, 5 days, 3 hours, 39 minutesMotherboardAssembly Number :Model RevisionNumber : K0ModelNumber : WS-C3850-24PSoftware Install Command Cisco 3850
Reloadscheduled for 21:05:00 PDT Tue Jun 9 2015 (in 6 hours and 36 minutes) byconsole
Cisco 3850 Commands Cheat Sheet
As you can see, this shows I am using code version 03.03.02. This is my non-production stack.
You can also issue the following command to reload on a specific day:
Switch#reload at 20:00 07 Dec Upgrade
or a specific time:
Switch#reload in 120 (reloads the switch in 2 hours)
Update - 6/10/2015
Reload/Upgrade successful!
Here is what the switch does when you are logged in to it.
Reload scheduled for 21:05:00 PDT Tue Jun 9 2015 (in 1 minute and 20 seconds) by xxxxxxxxx on vty0 (x.x.x.x)
Reload reason: 6/09/15 Upgrade
Swtich#sh clo
21:03:56.858 PDT Tue Jun 9 2015
Switch#
***
*** --- SHUTDOWN in 0:01:00 ---
***
Switch#
***
*** --- SHUTDOWN NOW ---
***
Update - 4/29/2016Cisco 3850 Stack Commands
Cisco 3850 Reload Slot Command Block
Cisco 3850 Switch CommandsWe are no longer on IOS 03.07.00 and have actually downgraded to 03.06.04 which is the recommended release. We were having some ’bug’gy behavior.
Register here: http://gg.gg/ogq7f
https://diarynote.indered.space
コメント